Ranch View Terrace
- Formerly inclusion area Dlocated on 28 acres, directly west of the main entrance to campus on a knoll extending from the Farm and Arboretum to just above the Barn theater and Cook House.
- Will consist of 80 housing units
- Design was started in January 2003 and has now been approved by the UC Regents
- As of September 2004, 50% of the construction documents have been reviewed
- Financial documents have also been approved
- Anticipated start of construction is between Fall 2004 and Winter 2005
- Estimated completion in Spring 2006
- Project Manager: Leon H. Waller
Home address: 677 Nobel Dr., Santa Cruz
Home phone: 426-1907
- Developer: Ambling West (renamed Valeo Companies)
2401 E. Katella Ave., Suite 220
Anaheim, CA 92806
(714) 940-0086
Fax: (714) 940-0087
Physical Sciences Building
- Would house laboratory and classroom space for Chemistry, Environmental Toxicology, and School of Engineering.
- 90% complete (8 months of work left)
- The budget for the project is almost $60 million
- Claude E. Atkins Enterprises terminated its contract and left the work undone-citing that there were design flaws that make it unbuildable.
- Design Consultant: Moore Ruble Yudell Architects and Planners
- Architect: Anshen and Allen
Cellular Phone Towers
Cell phone towers are included in the development section because the new towers are being put up to accommodate a growing student population.
Why they are Destructive
Check out this description of cell phone towers and the destructive effect they have on the health of communities
What is Planned
- Partnership with NextG Networks to build 6 new microcellular antennas
- Antennas are generally placed in an enclosure resembling a smokestack
- New antennas will be linked to land lines at the Communications Building via fiber optic lines
(see picture “proposed antenna” at http://currents.ucsc.edu/04-05/07-12/antennas.html)
Where
- Existing towers already installed north of Crown College off of Chinquapin fire road as well as on the antenna of KZSC
- New antennas would be installed at: Porter, College 8, Cowell college academic building, Science Hill, and base of campus
Who
- UC Telecommunications Manager:
Edward W. Titus
wife: Patsy
Office: 59 Kerr Hall
Office phone: 459-3990
Email: etitus@ucsc.edu
Home address: 110 Viki Court, Scotts Valley
Home phone: 430-0766
- NextG Networks
1759 South Main St, Suite 128
Milpitas, CA
(408) 719-8510